How to Plan an ADU or Remodel: A Homeowner's Guide

A good project starts well before the first day of work. A little planning makes the whole job easier, from your first estimate to the final walkthrough. Here's what to think about, in order.

1. Decide what you want

Start with why you're doing this. Is the space for family, guests or rental income, or do you just need more room? Your answer shapes everything that comes next.

Make two lists: what you must have, and what would be nice to have. If the budget gets tight, you'll already know what can wait.

Also think about timing. Are there dates you need to work around? How long can you live with construction at home?

Still choosing a project? See which ADU option fits your property.

2. Set a realistic budget

The biggest things that affect price are usually the size of the project, your property, your finishes, your utilities and your permits. Two projects that look alike can cost very different amounts.

Keep some money aside for surprises, especially in an older home. Walls and floors can hide things nobody can see during an estimate.

A price given before anyone sees your property is only a rough guess. For ADUs, our cost guide can help you get started.

3. Look over your property

You don't need plans to get started. Before your first meeting, gather a few things:

  • Photos of the space, inside and out.
  • Rough measurements, if you have them.
  • The year your home was built.
  • Any old plans or paperwork you can find.
  • Photos of projects you like.
  • Your questions, written down.

Also notice how workers and materials would get in. A narrow side yard or a shared driveway is good to mention early.

4. Choose your contractor

Start by looking up the license on the state's CSLB website. Check that the name and license number match what you were given.

Then ask a few questions:

  • Have you built this kind of project?
  • Who will be my main contact?
  • How will you keep me updated?
  • Who handles the permits and inspections?
  • What's included in the quote, and what isn't?

When you compare quotes, look at what each one includes, not just the total. A lower price may leave out work another quote covers.

5. Know what happens and when

Most projects follow the same basic order:

  1. 1 Planning and plans: your project gets designed and drawn up.
  2. 2 Permits: the plans go to the city for review, if your project needs a permit.
  3. 3 Construction: the work gets done in stages, with inspections along the way where required.
  4. 4 Final inspection and walkthrough: the work gets checked, and you go over the finished space.

How long it takes depends on your project and your city. Many ADU projects take about 3 to 9 months from design to move-in.

Most kitchen remodels take about 2 to 4 weeks once work begins, and most bathroom remodels about 1 to 2 weeks. Individual jobs vary.

6. Get ready for construction

A few simple steps make the work easier to live with:

  • Clear the area: move furniture, personal items and anything fragile.
  • Plan for parking: decide where workers can park and where materials can go.
  • Expect some disruption: there will be noise and dust, and water or power may be off at times.
  • Choose finishes early: special orders can take time, and late choices can slow the job.

Remodeling a kitchen? Set up a small temporary kitchen somewhere else in the house.

Remodeling your only bathroom? Talk through a plan before work starts.

7. Ready to talk about your project?

We can look at your property and go over your options.

This guide is general information, and every project and property is different. Information as of November 2026.