Accessory Dwelling Unit (ADU) Construction in Los Angeles

Maximize your property value with a custom Accessory Dwelling Unit. Build additional living space for guests, rental income, or family.

Why ADUs

Benefits of ADU Construction

Accessory Dwelling Units are a smart investment for Los Angeles homeowners.

Income Potential

Many homeowners build an ADU to rent out. What it earns depends on your area, the unit and the market.

Extra Space

Create additional living space for family members or guests.

Property Value

An ADU can add to your property's market value.

Permitting

We handle all permits and navigate LA zoning regulations.

Types of ADUs we build

What California law says

No minimum lot size.

Cities can't set a minimum lot size in their ADU standards.

A clear review process.

Applications are approved without a hearing if they meet the rules. The city must tell you within 15 business days whether your application is complete, and approve or deny a complete one within 60 days when a home is already on the lot.

Four-foot setbacks at most.

Cities can't require more than four feet from the side and rear lot lines for a new ADU.

Your city's standards still apply, so we check your property before you commit.

We make it easy

Building an ADU has a lot of moving parts, and you shouldn't have to manage them. You get one point of contact from start to finish.

Plans: use your own architect, one of the designers we work with, or a city pre-approved plan where one fits your lot.

Permits: we handle them.

Inspections: we schedule them and take care of anything the inspector flags in our work.

Updates: you'll get regular updates, and we'll reach out promptly if something needs your decision.

What to expect, from contract to move-in

Many ADU projects take about 3 to 9 months from design to move-in. Individual jobs vary, and your property, your plans and city review times can all change the timeline. Here's how a typical build goes:

  1. 1

    Before we break ground (1 to 2 weeks)

    We walk the site with you, confirm the written scope, and mark utilities.

  2. 2

    Underground utilities (1 to 3 weeks)

    Sewer, water and electrical go in first.

  3. 3

    Framing (2 to 4 weeks)

    Walls, roof and structure go up.

  4. 4

    Rough-ins and inspections (1 to 2 weeks)

    Plumbing, electrical and framing are inspected before drywall.

  5. 5

    Drywall through finishes (3 to 6 weeks)

    Drywall, paint, cabinets, flooring and fixtures.

  6. 6

    Final inspection and closeout (1 to 2 weeks)

    We walk the punch list with you and hand over your warranties.

A real example: we built a 1,200-square-foot detached ADU for a Los Angeles homeowner. The final cost was $285,000, and construction took 125 days.

Areas we serve

Burbank, Glendale, Pasadena, Long Beach, Los Angeles, North Hollywood, Sherman Oaks, Studio City, Encino, Woodland Hills, Northridge, Granada Hills, Porter Ranch, Chatsworth, San Fernando, Santa Clarita, West Hollywood, Culver City, Inglewood and Torrance.

Planning your budget? Read our guide: How Much Does an ADU Cost in Los Angeles?

Helpful guides: Which ADU option fits your property? How long does an ADU take? Do you have to live on the property?

Thinking about a pre-approved plan?

The City of Los Angeles and Burbank offer free ADU plans, and nearby cities have more you can buy from the architect. A pre-approved plan can save design time and shorten plan check.

See pre-approved ADU plans by city

Build Your ADU Today

Contact us to discuss your ADU project and get a free estimate.

This page is general information, not legal advice. Rules vary by property and city. Information as of November 2026.