Maximize your property value with a custom Accessory Dwelling Unit. Build additional living space for guests, rental income, or family.
Why ADUs
Accessory Dwelling Units are a smart investment for Los Angeles homeowners.
Many homeowners build an ADU to rent out. What it earns depends on your area, the unit and the market.
Create additional living space for family members or guests.
An ADU can add to your property's market value.
We handle all permits and navigate LA zoning regulations.
Cities can't set a minimum lot size in their ADU standards.
Applications are approved without a hearing if they meet the rules. The city must tell you within 15 business days whether your application is complete, and approve or deny a complete one within 60 days when a home is already on the lot.
Cities can't require more than four feet from the side and rear lot lines for a new ADU.
Your city's standards still apply, so we check your property before you commit.
Building an ADU has a lot of moving parts, and you shouldn't have to manage them. You get one point of contact from start to finish.
Plans: use your own architect, one of the designers we work with, or a city pre-approved plan where one fits your lot.
Permits: we handle them.
Inspections: we schedule them and take care of anything the inspector flags in our work.
Updates: you'll get regular updates, and we'll reach out promptly if something needs your decision.
Many ADU projects take about 3 to 9 months from design to move-in. Individual jobs vary, and your property, your plans and city review times can all change the timeline. Here's how a typical build goes:
We walk the site with you, confirm the written scope, and mark utilities.
Sewer, water and electrical go in first.
Walls, roof and structure go up.
Plumbing, electrical and framing are inspected before drywall.
Drywall, paint, cabinets, flooring and fixtures.
We walk the punch list with you and hand over your warranties.
A real example: we built a 1,200-square-foot detached ADU for a Los Angeles homeowner. The final cost was $285,000, and construction took 125 days.
Burbank, Glendale, Pasadena, Long Beach, Los Angeles, North Hollywood, Sherman Oaks, Studio City, Encino, Woodland Hills, Northridge, Granada Hills, Porter Ranch, Chatsworth, San Fernando, Santa Clarita, West Hollywood, Culver City, Inglewood and Torrance.
Our Work
Take a look at some of our recently completed ADU projects.
Los Angeles
Los Angeles
Planning your budget? Read our guide: How Much Does an ADU Cost in Los Angeles?
Helpful guides: Which ADU option fits your property? How long does an ADU take? Do you have to live on the property?
The City of Los Angeles and Burbank offer free ADU plans, and nearby cities have more you can buy from the architect. A pre-approved plan can save design time and shorten plan check.
See pre-approved ADU plans by cityContact us to discuss your ADU project and get a free estimate.
This page is general information, not legal advice. Rules vary by property and city. Information as of November 2026.