An attached ADU is a separate living unit connected to your existing home, with its own entrance. It can make sense when you don't have the yard for a separate building, or want the unit close by for family. Pro Vision Construction is a licensed California general contractor, CSLB #1151219. We work across the San Fernando Valley, Glendale, Burbank, Pasadena, Long Beach and greater Los Angeles.
An attached ADU is generally limited to 50 percent of your existing home's floor area. A limit based on that percentage can't stop an ADU of at least 800 square feet with four-foot side and rear setbacks, as long as it meets your city's other standards.
A city can't require more than four feet from the side and rear lot lines.
A city must allow at least 25 feet or the height limit for your main home, whichever is lower. It doesn't have to allow more than two stories.
Cities can't set a minimum lot size in their ADU standards.
Applications are approved without a hearing if they meet the rules. With a home already on the lot, the city must approve or deny a complete application within 60 days.
Your city's standards still apply, so we check your property before you commit.
Building an ADU has a lot of moving parts, and you shouldn't have to manage them. You get one point of contact from start to finish.
Plans: use your own architect or one of the designers we work with.
Permits: we handle them.
Inspections: we schedule them and take care of anything the inspector flags in our work.
Updates: you'll get regular updates, and we'll reach out promptly if something needs your decision.
It can be a good fit if your yard is limited or you want the unit connected to your home. If you want more separation, a detached ADU may suit you better. For a smaller unit inside your existing walls, look at a Junior ADU. We'll tell you which makes sense.
Our ADU cost guide puts a typical attached ADU at $125,000 to $295,000. That's a starting point, not a quote. We can't give a firm price until we've seen your property.
Many ADU projects take about 3 to 9 months from design to move-in. Individual jobs vary, and your property, your plans and city review times can all change the timeline. See how a typical build goes.
Helpful guides: Which ADU option fits your property? How long does an ADU take? How much does an ADU cost?
This page is general information, not legal advice. Rules vary by property and city. Information as of November 2026.