A detached ADU is a separate small home on your lot, with its own walls and roof. It gives family or tenants the most privacy, and gives you the most room to design around your property. Pro Vision Construction is a licensed California general contractor, CSLB #1151219. We work across the San Fernando Valley, Glendale, Burbank, Pasadena, Long Beach and greater Los Angeles.
State law allows a detached ADU of up to 1,200 square feet, but many cities set lower limits, often 800 to 1,000 square feet. We'll check yours.
A city can't require more than four feet from the side and rear lot lines.
A city must allow at least 16 feet. Near major transit it must allow at least 18 feet, and sometimes two more to match your home's roof pitch.
Cities can't set a minimum lot size in their ADU standards.
Applications are approved without a hearing if they meet the rules. With a home already on the lot, the city must approve or deny a complete application within 60 days.
Your city's standards still apply, so we check your property before you commit.
Helpful guides: Which ADU option fits your property? How long does an ADU take? How much does an ADU cost?
Building an ADU has a lot of moving parts, and you shouldn't have to manage them. You get one point of contact from start to finish.
Plans: use your own architect, one of the designers we work with, or a city pre-approved plan where one fits your lot.
Permits: we handle them.
Inspections: we schedule them and take care of anything the inspector flags in our work.
Updates: you'll get regular updates, and we'll reach out promptly if something needs your decision.
It can be a good fit if you have room in your yard and want the unit fully separate from your home. A new detached unit usually costs the most of the ADU types. If you have a garage or limited yard space, a garage conversion or an attached ADU may suit you better. We'll tell you which makes sense.
Our ADU cost guide puts a typical detached ADU at $130,000 to $365,000. That's a starting point, not a quote. We can't give a firm price until we've seen your property.
Many ADU projects take about 3 to 9 months from design to move-in. Individual jobs vary, and your property, your plans and city review times can all change the timeline. See how a typical build goes.
A real example: we built a 1,200-square-foot detached ADU for a Los Angeles homeowner. The final cost was $285,000, and construction took 125 days.
The City of Los Angeles and Burbank offer free ADU plans, and nearby cities have more you can buy from the architect. A pre-approved plan can save design time and shorten plan check.
See pre-approved ADU plans by cityThis page is general information, not legal advice. Rules vary by property and city. Information as of November 2026.