ADU Construction

How Much Does an ADU Cost in Los Angeles?

Most ADUs we build in Los Angeles cost between $69,000 and $365,000. A junior ADU inside your home can cost the least, and a new detached unit usually costs the most. Your property can move the price a lot, so here's what to expect and how to plan for it.

Typical cost by ADU type

ADU type What it is Typical cost
Garage conversion Turning an existing garage into a home $85,000 to $175,000
Attached ADU A new unit connected to your house $125,000 to $295,000
Detached ADU A new, separate building on your lot $130,000 to $365,000
Junior ADU A unit of up to 500 square feet inside your home $69,000 to $195,000

These ranges are a starting point, not a quote. We can't give you a firm price until we've seen your property.

What changes the price

  • Size and layout: more square footage usually costs more overall, but small units often cost more per square foot. Kitchens and bathrooms are often the most expensive rooms to build.
  • Your lot: slopes, tight access and soil conditions can all add work, especially to the foundation.
  • Utilities: the distance to your water, sewer and electrical lines matters, and so does whether your electrical panel needs an upgrade.
  • Finishes: cabinets, flooring, fixtures and windows can move the budget up or down quickly.
  • Design: a custom design costs more up front than a pre-approved plan, but it can fit your lot and goals better.

Fees and permits to plan for

California limits some of these fees, so it pays to know the rules.

Don't forget design and engineering fees. It's also smart to keep a contingency for surprises, which are common once work begins.

How long it takes

A typical project takes 3 to 9 months from design to move-in. Once a complete application is submitted, California generally requires a permit decision within 60 days if there's already a home on the lot. Corrections can add time, and so can design work before you apply.

Ways to keep the cost down

  • Convert what you have. A garage or other existing space can reduce structural work and some fees.
  • Stay under the fee limits. Keeping a unit at 750 square feet or less avoids impact fees, and staying at 500 or less avoids school fees.
  • Consider a pre-approved plan. Los Angeles' Standard Plan Program can shorten plan check. You still need a permit and drawings for your site, and your soil may still call for its own foundation work.
  • Choose finishes early. Late changes are a common cause of budget creep.
  • Check any grant claim carefully. The state's CalHFA grant of up to $40,000 says its latest funding has been fully allocated, and CalHFA warns that people offering to help you get one may be running a scam.

A real example

We built a 1,200-square-foot detached ADU for a Los Angeles homeowner. The final cost was $285,000, and construction took 125 days.

Get a price for your property

The quickest way to know what your ADU will cost is to have us look at your lot. Pro Vision Construction is a California licensed contractor (CSLB #1151219) building ADUs across Los Angeles. Request a free estimate, or call (818) 873-3837.

Fee rules and programs change, and your city may have its own requirements. This article is general information as of November 2026, not legal advice.